Skip to content
LPS learning centre

CRDA C2 Commercial Plot Building Rules

Commercial C2 plots follow a different table from residential plots, and coverage drops to 40% for the larger types. Read the C2 values as one set, and check which activity is allowed on your particular plot.

Last reviewed

Generic small shop model with a blue awning, trees and a gold plot boundary.
Illustration · Not an approved layout, building plan or site photograph.

Where these commercial values come from

Every C2 value below is copied from the Phase 1 Telugu ebook, from the revised table inserted on PDF page 8. Treat them as history, not as the rule for a plot today.

Commercial plots are zoned more finely than the booklet shows. Before anyone draws a plan, check the plot’s approved zone and any later amendments.

Plot size, FSI, coverage and floors for each type

Each row is one kind of commercial building. Owning a bigger plot does not by itself let you build the tallest type or run any business on it. G+3 means a ground floor with three floors above.

Basements appear as their own row in the source. Our calculator does not count them as extra shop or office space.

C2 values from the revised ebook table, PDF page 8. Plot area in sq yd, coverage in percent.
TypeMinimum plotFSICoverageStoreysBasements
Detached house30, 601.0070%G+10
One-side attached house1201.3070%G+30
Row housing / housing cluster3601.4050%G+30
Apartment 16001.6050%G+52
Apartment 224002.2040%G+53
High-rise 324002.2040%G+83
High-rise 436002.2040%G+83
Group development36002.2040%G+83

How far the building must stay from each boundary

Setbacks are the gaps you must leave between the building and the plot edges. The road-facing front has its own figure. Every value here is in feet.

Where the old table shows zero, that does not mean you may build right up to the neighbour. The approved building type and the actual site decide it.

C2 setbacks from the revised ebook, in feet. Side 1 and side 2 keep the source order.
TypeFrontSide 1Side 2Rear
Detached house3.3006.6
One-side attached house6.6006.6
Row housing / housing cluster16.410106.6
Apartment 123101010
Apartment 223101016.4
High-rise 323232323
High-rise 423101016.4
Group development23232323

Read the revision correctly

The revised detached column lists minimum plots of 30 and 60 sq yd, FSI 1.00 and coverage 70%. Its front setback becomes 3.3 ft.

The next three FSI values change to 1.30, 1.40 and 1.60. The final four columns each show FSI 2.20.

Coverage is 70% for the first two columns, 50% for the next two, and 40% for the last four.

The C2 table uses house and apartment labels in its column headings. We preserve those labels so readers can match the source. They do not establish permitted use on a specific plot.

Uses listed in the booklet

The earlier C2 panel lists uses such as guest houses, hostels, shops, banks, bakeries, training centres, service shops and nurseries.

Its special-permission panel includes uses such as old-age homes, nightclubs, courts, auditoriums, hospitals, auto repair and sports facilities.

These are translated examples from PDF page 7. The word commercial does not mean that every business is allowed. Check the detailed use schedule.

What to do before you apply to build

The building-area tool shows how the numbers combine. Then take that estimate and your plot papers to a qualified designer.

  1. Check the plot number, its boundaries and the area in the registered deed.
  2. Get the approved layout and find the exact commercial zone.
  3. Find the road width, whether it is a corner plot and whether the road will be widened.
  4. Have your designer check parking, fire access, height and structure, which matter more for shops and offices.
  5. Follow the current rules on water, energy and green cover.
  6. Do not start work until the approval is in hand.

Want a straight answer about a plot or a village?

We live and work in the capital villages. Send the survey number or LP number and we will tell you what we know, including the things that should make you pause.